enes +5411 4346-1000
·
info@eof.com.ar

Administrative intervention in the Port of Ushuaia’s infrastructure and 12-month suspension of its authorization

By means of Resolution 4/2026 (Official Gazette 01/22/2026), the National Ports and Navigation Agency (ANPyN) ordered the suspension of the authorization of the Port of Ushuaia granted by Decree No. 2404/2002 for a period of TWELVE (12) months, extendable for justified reasons, and ordered an administrative intervention in port infrastructure for the same period, with the aim of regularizing technical, operational, environmental, and safety conditions related to port operations.

Access the complete text of the Resolution here.


This publication does not constitute legal advice on specific matters. If necessary, specialized legal advice should be sought.

For more information, please contact:

Agustín Siboldi – SiboldiA@eof.com.ar

Jorge Muratorio – MuratorioJ@eof.com.ar

Ana Belen Micciarelli – MicciarelliA@eof.com.ar

Nives Fornarini Costa – FornarinicostaN@eof.com.ar